PROSPECT Course #366 - Construction Contract Administration. By USACE Learning Center | Course: 41CCA01A | Control: 366 Currently there are a large number of cost estimators in U.S. Army Corps of Engineers (USACE) that do not have the intermediate and advanced civil works cost estimating skills and knowledge to adequately perform their job The purpose of this training is to familiarize all quality control personnel, and other contractor management personnel, with CQM policies, requirements, and procedures. In addition to the filmed portions, this training package includes this Study Guide and pertinent classroom exercises provided by your Facilitator. Contract Analytics, Contract Management, Integrated Construction Technologies, and Project Control Construction. Consultant Services & Field Inspections and Regional Construction Engineers Contract Award Manual. Delivery of Proposals. Electronic Bidding System. Fuel, Asphalt, and Cement Prices The following is a list of Professional Consultant Contract Administration Procedures and Guidelines pertinent to procurement and administration of Engineers on Department Contracts 375-030-001 Professional Services Consultant Qualification 375-030-002 Acquisition of Professional Services Construction Project Administration Manual Founded in 1918, ACE is the major coordinating body for all the nation's higher education institutions, representing more than 1,600 college and university presidents and more than 200 related associations nationwide. It provides leadership on key higher education issues and influences public policy through advocacy. C-430 Bid Bond: Penal Sum Form. C-435 Bid Bond: Damages Form. C-451 Qualification Statement. C-510 Notice of Award. C-520 Suggested Form of Agreement between Owner and Contractor for Construction Contracts: Stipulated Price. C-522 Contract for Construction of a Small Project. C-523 Construction Subcontract. DRAFT Contract Administration Manual Government of Papua New Guinea Page 1 of 12 Edition 1, Revision 1 Issue date: August 2004 CONTENTS 1. INTRODUCTION 4 2. CONTRACT ADMINISTRATION 5 3. STAFF RESPONSIBILITIES 6 3.1 GENERAL 6 3.2 PROJECT MANAGER 6 3.3 CONTRACT ADMINISTRATION ENGINEER 6 3.4 RESIDENT ENGINEERS 7 3.5 SURVEYOR 7 Section 8, "Default of Project" Clarified the 10-day letter should be signed by the Area Engineer at minimum. Clarified when work suspension becomes excessive the contractor may be defaulted through the default process. Chapter 11, "Measurement and Payment" Section 1, "Forms and Guidance Documents" Added a direct link to the Response to Surety regarding contract status-Template form to Dannemann, thomas.r.dannemann@usace.army.mil, 917-790-8363. 1.1.3 Military Construction (MILCON) Transformation Designated Army MILCON and Army Base Realignment and Closure (BRAC) 2005 Act projects are subject to Army Transformation and supporting U.S. Army Corps of Engineers (USACE) MILCON Transformation (MT) procedures. The course objective is to provide students with the fundamentals of the Department of Defense (DoD) acquisition process as it relates to administration of fixed-price construction contracts. The primary focus of the course is post-award contract administration, but the course includes pre-award coordination and review for field-level personnel REQUIREMENTS MANUAL BUILD STROiVG SAFEL J'! EM 385-1-1 July 2014 I USACE . Safety & Health Requirements Manual . EM 385-1-1 (2014) C
© 2024 Created by Michael Bolton Admin. Powered by
You need to be a member of Michael Bolton to add comments!
Join Michael Bolton